• Bidding process will run from September 11th, 2024 at noon to October 3rd at noon.
• Public opening will be October 3rd at the Village council meeting, and notification will be made on October 4th by noon via email.
• This will be a freshwater system. ( freshwater to drain )
• Please provide manufacturer technical specs for equipment.
• Size of the splash pad to be somewhere between 900-1500 square feet
• Excavation of the site
• Installation of the concrete deck, Five (5) inch pour with rebar or fiber additive, medium broom finish and joints.
• Installation of splash pad and toys
• Rough grading of site and removing of spoils and site restoration when finished
• “Toys” to include but not limited to hoop, umbrella, ball/turtle, single dump bucket (small, med, or large) or any other “spray from the pad” up. Any combinations of these, not necessarily all.
• Will be Bollard or pressure activated so the water does not run continually
• Village will bring up to a 2” water line and up to a 6” sewer line within 10’ of the site. Company will be responsible for all plumbing connections
• Village will run electric up to 10’ of the site. Company will be responsible for all electric connections from there.
•Winterization covers that pertains to the toys and splash pad
• Installation of pad to be completed by May 1st 2025